ROMAN C. REYES, P.E. (Contd)
Fourteen
years of civil engineering experience including transportation, civil site
work for residential/commercial/ retail projects, public works, and
infrastructure projects. Emphasis consists of design of roadways, site
planning /design, gravity/ pressure utility conveyance systems, grading and
drainage, Storm Water Pollution Prevention Plans (SWPPP), Building
Information Modeling (BIM), Sustainability, and right of way
engineering.
EXPERIENCE
PARSONS - Senior Civil Engineer (March 2008 to Present)
Metro Goldline Extension Project, Azusa CA (Metro) - Responsible for civil site design of the Goldline
light rail extension "Maintenance and Operation Facility"
(M&O). The 24 acre M&O site has a 100M$ estimated construction cost
of a 500M$ project that will store up 84 light rail vehicles for maintenance.
Served as the Lead Civil Engineer, duties included overseeing the site,
grading, drainage, and roadway plans. Supervised four personnel..
Goethals Bridge Replacement Project, Statin Island, NY - The design build project consisted of a billion
dollar bridge replacement project connecting New York and New Jersey.
Assisted in specifications, roadway and utility plans.
Louisiana Energy Services, Nuclear Enrichment Facility, Eunice, NM - The project consists of the design and
construction of two uranium enrichment process buildings and the expansion of
another conforming to “ASME NQA-1-1994, Quality Assurance Requirements for
Nuclear Facility Applications” procedures. Served as the Lead Civil Engineer
and prepared an excavation plan, site plan establishing horizontal control,
grading plans, and utility plans.
Santa Anita / Valley Boulevard Street Widening Project, El Monte CA(
City of El Monte) – Responsible
for design and production of a roadway intersection widening at the major
intersection of Santa Anita Avenue and Valley Boulevard. Duties included
plans and profiles design, utility relocation, striping, and traffic control
plans. Supervised two personnel.
Pacific Gas and Electric, Crane Valley Dam Seismic Modification
Project, Bass Lake, California
- The project consists of a seismic
retrofit of an existing earth dam in the southern Sierra mountains of Madera
County. Duties include design and planning for a rock mining quarry site
adjacent to the dam, developing haul road alignments, drainage structures,
grading and drainage structures, hydrology studies, design alternatives, 3-D
digital terrain modeling (DTM) earthwork calculations, SWPPP and erosion
control, client and consultant coordination. Also served as the Interim
Quality Control Manager and Environmental Compliance Manager at the
construction site. Supervised three engineers/designers.
Wonder Valley Solar Photo Voltaic Project, Twentynine Palms CA (Sustainable Energy
Capital Partners)– Project
consist of planning and design of a 100MW photovoltaic solar power plant
located in Dale Dry Lake of the Mohave Desert. Duties include site planning,
solar p720anel arrangement, and survey horizontal control, survey and
geotechnical requisitions, oversaw flood plain analysis. Supervised four
engineers/designers.
Titanium Sponge Plant Project, Hamilton, MS (RTI Metals) - Responsible for design of civil elements
such as site plan, roads, water distribution system, sanitary sewer
collection system, wastewater collection system, secondary containment,
grading design, 3-D digital terrain modeling (DTM).
Supervised one civil engineering designer.
F-35 Building 637 Expansion, Palmdale CA (Lockheed Martin
Aeronautics) – Project
consisted of a building expansion to support the manufacturing of the F-35
fighter jet program. Duties include preparation of the demolition plan, site
plan, grading/drainage plan, utility relocation plan, and erosion control
plan.
Military Operations On Urban Terrain (MOUT), Camp Pendleton CA (U.S.
Marine Corps.) – Project consisted of the site design for multiple
military combat training facilities. Responsibilities included 3-D grading and
earthwork calculations, drainage and hydrology, and site horizontal control.
Supervised two personnel.
Hawaii Regional Military Housing Project, Hawaii (Forest City Military Communities)- Responsible for civil engineering plan revision
work including grading, water distribution plans, site plans, horizontal
control, sanitary sewer collection, storm drainage, and erosion control plan.
KIMLEY HORN & ASSOC.
- Civil Engineer (February 2007
to March 2008)
Wilshire Blvd. / Beaudry Street Widening Project, (Amidi Group) - Responsible for roadway/intersection widening at
major intersection of Wilshire Blvd. and Beaudry Avenue to obtain a City of
Los Angeles B-Permit. Task included utility research and relocation
coordination, preparation of striping plans, traffic control plans, cross
sections, and client coordination. Supervised one personnel.
Various Department Store Projects, CA & TX (
Costco/Kohl’s/Wal-Mart, )
- Responsible for hydrology calculations and reports, grading and drainage,
utility and site layout, horizontal control plans, Standard Urban Storm Water
Management Program (SUSMP) preparation, digital terrain modeling (DTM) using
Autodesk Land Development Desktop (LDD), road layout and vertical profiles,
comply with NPDES and SWPPP requirements, City of Los Angeles B-Permit street
improvement plans, and construction support.
HUNSAKER & ASSOC. - Civil Engineer
(March 2004 to February 2007)
Various Street Improvements Projects within the County of Los Angeles - Responsible for design of new roadways, and
widening of existing roads/intersections for approx. 15 projects within the
City and County of Los Angeles. Roads vary from residential minor streets to
major arterial roadways, and were in accordance with Caltrans design
standards.
Anaverde Master-Plan Community in Palmdale CA, (Anaverde LLC) - Responsible for design and production of civil
improvement plans for a 5,000 home subdivision project, as well as other
various subdivision projects. Tasks included roadway design, water, sewer and
storm drain distribution, hydrology/hydraulic calculations, and client
coordination.
Canyon
Crossings Shopping Center, Riverside CA (Transcan LLC)
- Responsible for design and production of civil improvement plans for
90-acre mixed use development project. Tasks included design of street
improvement plans, grading plans, water distribution plans, sanitary sewer
collection plans, drainage hydrology/hydraulic calculations, storm drain plan
and profiles, and client coordination.
PACIFIC COAST CIVIL - Engineer (February
2003 to March 2004)
Lake Sherwood Residential Development Project - Responsible for preparing civil site improvement
plans for Lake Sherwood, and various residential subdivision projects. Tasks
included roadway design, grading, water, sewer and storm drain distribution.
BOYLE ENGINEERING - Assistant Engineer (January. 2002 to February 2003)
Owens Lake Shallow Flooding Irrigation Project, Keeler CA (Los Angeles Department of Water and Power) -
Project
scope of services included designing and installing an irrigation pipeline
network, water conveyance and control systems. Duties included pressure
hydraulic calculations, water storage tanks, and pump stations. Construction
phase services reviewing shop drawing submittals, RFI’s, and verifying
compliance with specifications. Assisted in developing budgets, work-plan
schedules, and tracking man-hours.
REGISTRATIONS -Registered
Civil Engineer, California No. 72093, LEED AP, Qualified SWPPP Developer
(QSD#20647)
EDUCATION - Bachelor of Science in Civil Engineering, California Polytechnic State University, San Luis
Obispo, 2001
COMPUTER SKILLS -AutoCAD
Civil 3D & LDD, Win-TR55, Flowmaster, Water Surface Pressure Gradient
(WSPG)
FOREIGN LANGUAGES - Spanish